Birken Lofts
401 W. Ontario Street in Chicago’s River North neighborhood. Adaptive reuse transforming a historic loft building into 57 modern residences.
CMAR • GUARANTEED MAXIMUM PRICE
3F Construction provides full-lifecycle Chicago construction management and Construction Manager at Risk (CMAR) services, acting as the single operational link between institutional owners, architects, engineers, and specialty trade partners from due diligence through final turnover.
Unlike traditional bid-day contracting where cost surprises surface after drawings are stamped, our developer-led team joins during design development to validate constructability, test real-time Chicagoland trade pricing, and lock in a transparent Guaranteed Maximum Price (GMP) with open-book subcontractor buyouts.
Whether managing a complex River North heavy-timber adaptive reuse like Birken Lofts, an occupied amenity overhaul like SoNo East for Greystar, or stepping in to rescue a stalled Loop landmark renovation like Century Tower for Golub & Company, we align daily field execution directly with your investment pro forma.
DEVELOPER-ALIGNED CMAR DELIVERY
Under 3F Construction’s Construction Manager at Risk (CMAR) model, ownership retains full visibility into every dollar of trade cost, general conditions, contingency, and fee while transferring construction cost-overrun exposure to 3F once the Guaranteed Maximum Price (GMP) is established. Early involvement eliminates the adversarial change-order dynamic of hard-bid contracting and lets us release long-lead procurement packages—switchgear, windows, custom cabinetry, quartz slabs, and MEP equipment—months ahead of field mobilization.
Our leadership team brings real estate development and institutional finance backgrounds to the construction trailer. We have seen investors close on acquisitions without early contractor validation only to discover underwriting budgets running up to 75% short of actual construction cost. Engaging 3F as Construction Manager during schematic design or due diligence replaces guesswork with live Planswift/Sage estimates, proprietary Chicagoland trade labor data, and constructible details that preserve architectural intent.
When Golub & Company brought 3F into Century Tower in 2019 after another general contractor failed to execute the renovation program, our team audited every drawing and finish specification, delivered targeted value engineering without degrading luxury unit appeal, and completed the historic Loop landmark on budget and on schedule through pandemic supply disruptions.
PHASE-BY-PHASE DELIVERABLES
Every CMAR engagement follows a documented deliverable framework with clear owner decision gates before capital is committed.
Physical building walk-throughs, MEP and structural condition assessments, municipal code feasibility, and preliminary order-of-magnitude budgets calibrated to Chicago trade markets before closing.
Side-by-side collaboration with your architect and structural/MEP engineers to strip out non-value-adding cost while keeping tenant-facing finishes sharp. We evaluate mechanical alternatives such as packaged HPAC systems and optimize kitchen millwork around full countertop slab yields.
Competitive multi-bid solicitation across vetted Chicago union and non-union subcontractors using Planswift and Sage Estimating takeoffs. We level every bid side-by-side with ownership, establish a transparent GMP, and execute direct factory material orders.
Dedicated 3F Project Managers and Site Superintendents coordinate daily trade production, safety compliance, and rigorous multi-point quality inspections. Owners track progress in real time through Procore with electronic schedule alerts and rolling 3-week lookaheads.
Zero-defect punch-list management through Procore, final City of Chicago DOB inspections and Certificates of Occupancy, full O&M/warranty handover to property management, and final open-book GMP cost reconciliation.
GMP TRANSPARENCY
Institutional owners, lenders, and joint-venture equity partners rely on CMAR + GMP because every component of project cost is auditable from day one.
| GMP Component | What It Covers | Cost Risk & Savings Treatment | Owner Visibility |
|---|---|---|---|
| Cost of the Work | Competitively bid trade subcontracts, self-perform labor, and direct factory-procured materials. | Passed through at actual invoiced cost; buyout savings flow to contingency or owner savings. | Full open-book bid tabs, subcontracts, and supplier invoices. |
| General Conditions | On-site supervision, project management, Procore software, temporary protection, dumpsters, and site logistics. | Capped or lump-sum agreed upfront based on master MS Project duration. | Itemized monthly billing schedule aligned to project milestones. |
| CM Construction Contingency | Scope-gap protection, unforeseen minor field coordination, and trade escalation buffer inside the GMP. | Used only with written owner notice; unused balance returns to owner or splits per contract. | Tracked monthly in Procore contingency draw log. |
| CM Fee | Fixed percentage or lump-sum contractor overhead and profit established at GMP execution. | Fixed; does not inflate on routine trade buyout adjustments. | Disclosed as a distinct line item on every pay application. |
| Savings-Sharing Clause | Total final actual cost completed below the established Guaranteed Maximum Price. | 100% returned to owner or shared on a pre-negotiated split (e.g., 75/25) to incentivize aggressive VE. | Verified via final open-book closeout accounting audit. |
Contract structures are tailored to lender and equity requirements using standard AIA A133 (CMAR with GMP) or negotiated commercial agreements.
QUALITY & SCHEDULE GOVERNANCE
Strong construction management prevents rework before drywall closes and keeps institutional lenders, asset managers, and design teams working from a single source of truth.
Microsoft Project + Procore
We build critical-path baseline schedules in Microsoft Project during predevelopment, then manage active field sequencing inside Procore so owners receive automated activity updates and inspect rolling three-week trade lookaheads.
First-Unit Mockups to Final Punch
Quality is engineered upstream rather than patched during final walkthroughs. On multifamily programs, we build and sign off a benchmark model unit with ownership and the architect before releasing mass production.
Backed by Real Estate Finance Leadership
Led by seasoned real estate finance and accounting leadership, 3F delivers clean AIA draw packages, timely lien waivers, and proactive budget forecasting that prevent lender funding delays.
Developer Underwriting Mindset
We protect finishes that drive leasing velocity while eliminating hidden waste. At River City, aligning cabinet layouts with full quartz slab dimensions boosted countertop yield by 85% with zero aesthetic compromise.
Across Chicago mid-market acquisitions, we routinely see buyers lock into closing budgets without contractor review—only to find true construction scope running dramatically above underwriting. Bringing 3F in during due diligence or schematic design aligns scope, rent premiums, and GMP reality before capital is at risk.
Frequently Asked Questions
In traditional hard-bid General Contracting, the builder enters after architectural drawings are 100% complete and prices a fixed lump sum. In Construction Management at Risk (CMAR), 3F joins during preconstruction and design development as an open-book advisor to guide budgeting, constructability, and value engineering, then locks in a Guaranteed Maximum Price (GMP) and assumes construction delivery risk.
A GMP caps the owner’s maximum exposure for the defined scope. Every trade bid, material purchase, and contingency draw is tracked open-book. If 3F delivers the project below the GMP through smart buyouts, direct material procurement, or value engineering, the savings return to the owner (or split according to a negotiated shared-savings incentive) rather than becoming hidden contractor margin.
Ideally during acquisition due diligence or early schematic design—before architectural and MEP decisions harden into costly details. Early involvement lets our estimating team validate pro forma budgets with Planswift and Sage Estimating, evaluate structural and code constraints, and sequence long-lead procurement ahead of permit issuance.
Every project runs on Procore paired with Microsoft Project master schedules. Owners, asset managers, and architects have transparent access to rolling 3-week lookaheads, RFI and submittal logs, daily field reports, progress photos, contingency tracking, and monthly lender-ready pay applications with lien waivers.
Yes. For example, Golub & Company engaged 3F at Century Tower in the Chicago Loop after a prior general contractor failed to execute the renovation program. We re-audited the drawings and specifications, implemented targeted value engineering, and completed the project on budget and on schedule.
Yes. 3F maintains a deep, vetted Chicagoland subcontractor network and manages open-book competitive bidding tailored to the building’s operational, lender, neighborhood, and labor requirements across downtown Chicago and the surrounding suburbs.
3F sources high-impact finish packages—such as cabinets, quartz countertops, LVT plank flooring, drywall, and plumbing fixtures—directly from local or overseas manufacturers. Under an open-book CMAR/GMP structure, eliminating distributor markups flows directly into lower Cost of the Work and stronger unit-economics for ownership.
Selected Work
401 W. Ontario Street in Chicago’s River North neighborhood. Adaptive reuse transforming a historic loft building into 57 modern residences.
Located in the heart of downtown Palatine, Park Towne Apartments is set for a full renovation of all 132 units and common areas. Nestled in a vibrant yet peaceful neighborhood, the building offers unmatched convenience—walk to the Metra station, local dining, shopping, theaters, and all that downtown Palatine has to offer.
With reimagined amenity spaces and elevated finishes, SoNo East now offers residents a modern, welcoming environment in the heart of Chicago’s Lincoln Park neighborhood.
Century Tower is a stunning historic landmark in Chicago’s Loop. It was built in 1930 and was originally the Trustees System Service Bank Building. At the time of its construction, Century Tower was the tallest reinforced concrete building in the world. Architects, Thielbar and Fugard, spared no detail.
Adaptive reuse converting 24 office suites into 66 residential units at The Smith in River North.
The Wolcott Group contracted with 3F Construction to help design and renovate all 448 residential units and perform substantial upgrades to the building. River City remains the largest condo to apartment deconversion in the history of Chicago.
Related Resources & Tools
Preconstruction
Site analysis, MS Project scheduling, value engineering, and Planswift/Sage budgeting before GMP lock.
Procurement Guide
How factory-direct sourcing and slab-yield value engineering protect GMP budgets from inflation.
Permits & Code
Navigate Standard Plan Review, Self-Certification, Developer Services, and Energy Transformation Code.
Start a Conversation
Bring 3F Construction in during due diligence or design development for open-book CMAR budgeting, constructability review, and Guaranteed Maximum Price delivery.
Start Your Project