| Best Suited For | Acquisition due diligence, early feasibility, and pre-permit budgeting before closing or CD lock. | Complex adaptive reuse, office-to-residential conversions, and multi-phase renovations with design still evolving. | Fully designed commercial, mixed-use, ground-up, and renovation projects ready for fixed-price execution. | Prime GCs or institutional owners needing high-velocity 50+ units/month interior apartment turns under one contract. |
| When 3F Joins | Pre-close, concept, or schematic design—before architectural details harden into cost overruns. | Schematic design or Design Development (30%–50% drawings) to shape scope, VE, and early procurement. | Near or at 100% Permit / Construction Documents for competitive trade buyout and mobilization. | During prime GC bid phase or 30–60 days ahead of rolling Notice-to-Vacate (NTV) turn schedules. |
| Contract & Pricing Model | Fixed preconstruction advisory fee (frequently credited toward construction fee upon award). | Open-book Construction Manager at Risk (CMAR) with Guaranteed Maximum Price (GMP), contingency, and fixed fee. | Lump-sum / stipulated fixed price or negotiated commercial general contracting agreement. | Standardized per-unit / per-tier turnkey subcontract pricing backed by direct factory material kitting. |
| Cost Risk & Savings | Eliminates underwriting blind spots—prevents closing with budgets running far short of actual Chicago trade costs. | GMP caps owner cost exposure; open-book buyout and VE savings return to owner or share per contract. | 3F absorbs labor and trade buyout execution risk for the defined scope once lump-sum contract is executed. | Locks predictable unit-turn economics and eliminates multi-trade remobilization and idle-time cost leakage. |
| Schedule & Velocity | MS Project master milestone plan identifying DOB permit lead times and long-lead procurement gates. | Fast-track capable: early demolition, structural, and factory material orders release ahead of final finish drawings. | Disciplined critical-path MS Project baseline tracked live in Procore with 3-week trade lookaheads. | Assembly-line takt scheduling delivering up to 50+ renovated units per month in occupied buildings. |
| Direct Material Procurement | Slab-yield and finish value engineering (e.g., optimizing cabinet dimensions for 85% quartz efficiency). | Factory-direct cabinets, quartz, LVT, drywall, and fixtures passed through open-book inside the GMP. | 3F direct purchasing eliminates distributor markups and protects fixed-price schedule against stockouts. | Pre-kitted, factory-direct apartment material packages staged by unit number before demo begins. |
| Representative 3F Projects | River City (6-month diligence), The Smith at 223 W. Erie, Century Tower VE rescue. | Birken Lofts (57 units), Park Towne Apartments (132 units), SoNo East (Greystar). | 415 Premier (221 units), Avant at the Arboretum (310 units), 1233 Chicago Ave., 851 West Grand. | The Vivian (with Summit Design + Build), Cubed Construction partnerships, The Edison (100+ units). |